THE COMPLETE GUIDE TO ADU PERMITTING IN COLORADO

The Ultimate Guide to ADUs and Permitting in Colorado Building an Accessory Dwelling Unit (ADU) in Colorado is one of the smartest moves you can make to maximize your property’s potential. Whether you’re dreaming of a rental unit, a cozy space for family, or a value-boosting addition to your home, ADUs are a fantastic solution. But let’s be real—the permitting process can feel a bit overwhelming. With different rules across cities, zoning laws to navigate, and paperwork to tackle, you’ll want some guidance to make the journey easier. That’s where this guide comes in. We’ve broken everything down, step by step, so you’ll feel confident and informed as you start your ADU project. Let’s dive in.

What is an ADU?

Think of an Accessory Dwelling Unit (ADU) as a mini home that shares your property with your main house. These compact, fully livable spaces have their own kitchen, bathroom, and sleeping area—perfect for housing family members, generating rental income, or creating a flexible guest retreat.

Types of ADUs

  1. Detached ADUs: These are standalone units, like a tiny home in your backyard. They offer the most privacy and work well as rentals or for hosting long-term guests.

  2. Attached ADUs: These share at least one wall with your home—think of it as an add-on unit that blends seamlessly with your main house.
  3. Garage Conversions: If you have an unused garage, converting it into an ADU is a cost-effective way to create extra space.

No matter the type, ADUs are all about making the most of your property in a way that fits your lifestyle.

Why Build an ADU in Colorado?

Let’s talk about why ADUs are a game-changer, especially here in Colorado. Whether you’re looking to make extra money or bring family closer, the benefits of an ADU are hard to beat.

Generate Rental Income

  • Renting out your ADU is one of the easiest ways to create passive income. In Colorado, you can expect to earn between $1,500 and $2,500 a month, depending on location and size.

  • ADUs are also perfect for short-term rentals, catering to Colorado’s thriving tourism market.

Create Multi-Generational Living Spaces

  • Whether you’re looking for a solution for aging parents or adult kids who need a little help starting out, ADUs offer the perfect blend of independence and togetherness.

Boost Property Value

  • Adding an ADU can increase your home’s resale value by 20–35%, making it an investment that pays off in more ways than one.

Support Sustainability

  • ADUs use your existing property efficiently, making them an eco-friendly option compared to building a separate home.

Enjoy Favorable Legislation

  • Thanks to recent laws like HB 24-1152, Colorado has made it easier than ever to build an ADU. The law removes barriers like restrictive zoning, so more homeowners can build without the headache.

Understanding ADU Permitting in Colorado

Building an Accessory Dwelling Unit (ADU) in Colorado requires more than just a great design and a solid plan—it also means navigating the permitting process. Permits ensure your ADU meets local building codes, zoning laws, and safety standards. These regulations are in place to keep both the homeowner and the community safe while ensuring that the tiny home or granny flat you build fits within the neighborhood.

In Colorado, the permitting process can vary by city or county, but it typically follows a similar path. Here’s a closer look at what the ADU permitting process involves, and how to ensure your project is compliant.

What Does the ADU Permitting Process Involve?

At its core, the ADU permitting process ensures that your new unit is safe, legal, and functional. The primary goal is to make sure your ADU:

  • Meets local building codes: Ensures structural integrity, safe electrical and plumbing systems, and proper energy efficiency.

  • Complies with zoning regulations: Ensures that your ADU fits within the allowed use for your property and adheres to local zoning laws.

  • Protects the environment and neighborhood: Confirms your ADU complies with local restrictions on things like water usage, waste management, and parking.

Permitting is a non-negotiable part of the construction process and must be done before any work begins. When it comes to tiny homes or granny flats, getting the proper permits ensures that your project is not only compliant with state and local laws but also built to last.

What Permits Do You Need?

You’ll need several key permits to move forward with your ADU in Colorado. The permitting process generally involves the following:

  1. Zoning Permits
    Zoning regulations are critical to the success of your ADU project. They determine where and how you can build on your property. In Colorado, zoning regulations vary significantly by city and county. Common zoning requirements for ADUs include:


    • Minimum lot size and setback requirements (distance from property lines).
    • Height limitations for your detached ADU or other structures.
    • Requirements for parking spaces (though some areas, like Denver, have waived this in transit-oriented zones).
    • Design review processes in certain neighborhoods (especially in historical or highly regulated areas).

These regulations ensure that your ADU won’t negatively affect your property’s aesthetic or impact neighboring homes. For example, in Denver, you need to verify that the ADU zoning allows for a structure like a tiny home for sale or a granny flat to be built on your property.


  1. Building Permits

    Once your ADU passes the zoning review, you’ll need a building permit. This permit ensures that the construction of your tiny home or granny flat meets all safety and structural standards. Building permits cover:


    • The structural design of the ADU, including its foundation, framing, and roofing.

    • Safety requirements, including electrical, plumbing, and mechanical systems.

    • The overall energy efficiency of the structure, including insulation, windows, and HVAC systems, which are essential in Colorado’s climate.

A qualified ADU builder in Colorado, like Kindred Tiny Homes, can help ensure that all these components are up to code and make the permitting process smoother. With our expertise in tiny home construction and local ADU regulations, we’ll make sure everything is done right from the start.


  1. Utility Permits

    Connecting your ADU to utilities (water, sewer, electrical, and sometimes gas) is another essential step in the permitting process. Utility permits ensure that the connections are safe and meet local codes. Depending on your property, these connections may need to be upgraded or extended.


    • Water and sewer connections can be costly and time-consuming if your property isn’t already connected to the mainline. You may need to upgrade your system to accommodate your new ADU.

    • Electrical upgrades: If your existing system isn’t sufficient to support the additional load, you may need to upgrade your electrical panel or wiring.

    • Gas lines may also require adjustments depending on whether your ADU will have a gas stove, water heater, or other appliances.

At Kindred Tiny Homes, we help navigate these complexities by managing all utility permits and working with trusted local contractors to ensure smooth connections

  1. Energy Compliance

One of the most important aspects of the permitting process is ensuring that your ADU meets Colorado’s energy efficiency standards. These standards help reduce the energy footprint of new buildings and are designed to lower operating costs in the long term.

  • The Colorado Energy Code sets requirements for insulation, windows, and HVAC systems to ensure your ADU remains energy efficient year-round.

  • Many tiny homes for sale in Colorado are designed with sustainability in mind, and adherence to these energy codes not only helps the environment but can also result in lower energy bills for homeowners and tenants.

At Kindred Tiny Homes, we’re experts at navigating the ADU construction process in Colorado, so you don’t have to worry about the paperwork. From zoning permits to energy compliance, we handle the details so you can focus on building your dream space.

Zoning and Eligibility Requirements

Building an Accessory Dwelling Unit (ADU) in Colorado starts with understanding the zoning and eligibility requirements for your property. Each city and county in Colorado has unique rules and regulations governing where and how ADUs can be built. Navigating these zoning laws can feel complex, but understanding them is essential for a smooth project.

Here’s a deeper dive into what you need to know to determine if your property is eligible for an ADU, along with tips for overcoming common hurdles.

Key Zoning Factors for ADUs in Colorado

  1. Lot Size
    • Many cities, including Denver and Boulder, require a minimum lot size to build an ADU. For example, Denver typically mandates a lot size of 5,500 square feet for a detached ADU.

    • Smaller lots may still qualify for interior ADUs or garage conversions, making them an excellent option for homeowners with limited space.

Always check with your local zoning office or consult an experienced ADU builder in Colorado to confirm your lot’s eligibility.

  1. Setback Requirements:


    • Setbacks refer to the required distance between your ADU and the property line. In most areas, setbacks range from 5 to 15 feet, depending on local regulations.

    • Rear and side setbacks are typically stricter for detached ADUs, while attached ADUs or garage conversions often have more lenient rules.

  2. Height Restrictions


    • Height limits are usually in place to ensure ADUs remain proportional to the main residence and do not overshadow neighboring homes.

    • Most municipalities cap ADU height at 16 to 25 feet, depending on the type of unit and the zoning district. Detached ADUs may have stricter limits compared to attached ADUs or garage conversions.

    • For homeowners planning a two-story ADU, it’s critical to verify these limits early in the design process to avoid costly revisions.

  3. Parking Requirements


    • Some cities require that properties with ADUs provide at least one additional parking space for the unit.

    • However, progressive cities like Denver have waived parking requirements in certain transit-oriented areas, making ADU development more accessible.

    • If parking is required, think creatively—such as utilizing a driveway extension or shared parking space—to meet local rules without compromising your property layout.


  4. Design and Aesthetic Guidelines


    • In neighborhoods with historical significance or strict HOAs, there may be additional design requirements for ADUs. These might include materials, rooflines, and architectural features that match the primary residence or neighborhood.

    • While Colorado’s HB 24-1152 limits HOA restrictions, they can still enforce reasonable guidelines to maintain the character of the area.

Permitting Steps: From Start to Approval

The permitting process is one of the most critical steps in building an Accessory Dwelling Unit (ADU) in Colorado. It ensures your unit is legal, safe, and ready for construction. Each stage of the process plays a role in turning your vision into reality. Let’s walk through the steps, adding depth to help you better understand what to expect and how to prepare.

Step 1. Feasibility Assessment

Before diving into the design and construction of your ADU, the first step is conducting a feasibility assessment. This initial stage determines whether your property is eligible for an ADU based on local zoning regulations and physical constraints.

  • Site Evaluation: A professional will review your lot size, setbacks, and access to utilities, ensuring it meets Colorado’s zoning requirements. For example, in cities like Denver, lot size and rear setbacks are key factors that influence feasibility.

  • Zoning Research: Understanding local rules is crucial. Some municipalities, like Boulder, have stricter rules for setbacks and parking, while others, like Colorado Springs, are more flexible.

This step saves you time and money by identifying potential roadblocks before you invest in design or permitting.

Step 2. Design and Planning

With feasibility confirmed, the next step is to design your ADU. This is where your vision starts to take shape.

  • Architectural Design: You’ll work with an architect or design team to create a plan that fits your needs while adhering to local regulations. This includes decisions about unit size, layout, and features like energy-efficient windows or solar-ready roofing.

  • Pre-Approved Plans: Some cities offer pre-approved ADU designs, which can simplify the permitting process and reduce review time. These plans are particularly popular in tiny home construction, as they streamline compliance with building codes.

  • Customization: Whether you’re planning a detached ADU, a garage conversion, or an attached unit, this stage allows for personal touches that make the space uniquely yours.

The design process typically takes 1–3 months, depending on the complexity of the project and local permitting requirements.

Step 3. Permit Submission

Once your design is finalized, it’s time to submit the plans for permits. This is often the most time-consuming part of the process, as it involves multiple layers of review.

  • Zoning Review: Local zoning officials will evaluate your plans to ensure they comply with setbacks, height restrictions, and other requirements. In areas like Denver, Boulder and Fort Collins, the review may include neighborhood-specific design guidelines.

  • Building Permit Application: This step involves submitting detailed architectural and engineering plans. These documents must cover everything from the structural integrity of the unit to electrical and plumbing systems.

  • Utility Permits: You’ll also need permits to connect your ADU to water, sewer, and electrical systems. If your property requires utility upgrades, these will need to be approved as well.

The timeline for this stage varies, typically taking 1–4 months. Delays can occur if plans need revisions or if local offices are backlogged, but an experienced ADU builder can help navigate these challenges.

Step 4. Permit Approval

Receiving your permits is a major milestone—it means your plans are fully approved, and construction can officially begin.

  • Pre-Construction Checklist: Before breaking ground, confirm all permits are valid and accessible on-site. Some cities require that permits be displayed during construction.
  • Utility Preparations: If your project includes utility upgrades, ensure your contractors are ready to coordinate with local utility providers.

This stage also marks the transition from planning to action. At Kindred Tiny Homes, we make sure every detail is squared away before moving forward, so you can start your build with confidence.

Challenges of ADU Permitting and How to Overcome Them

Building an Accessory Dwelling Unit (ADU) in Colorado is an exciting venture, but the permitting process can come with its share of challenges. These obstacles are often the reason many homeowners feel overwhelmed before they even begin. The good news? Understanding these potential roadblocks ahead of time—and knowing how to navigate them—can make all the difference.

Here’s a deeper look at the most common permitting challenges and how to overcome them, with a few tips to keep your project on track.

1. Navigating Complex Regulations

Every city and county in Colorado has its own set of zoning laws, building codes, and energy standards for ADUs. These regulations vary widely, which means what works in Denver might not apply in Boulder, and what’s permissible in Colorado Springs may not fly in Fort Collins.

For example:

  • Lot size and setbacks often limit where you can place a detached ADU on your property.
  • Historical neighborhoods may have stricter design guidelines to preserve the area’s character.
  • Cities like Boulder may enforce tighter height restrictions, while Denver’s transit-oriented zones waive parking requirements for ADUs.

Solution:
Partnering with an experienced ADU builder in Colorado is the easiest way to navigate these complexities. At Kindred Tiny Homes, we know the ins and outs of Colorado’s ADU regulations, saving you hours of research and ensuring your project complies with local laws.

2. Lengthy Approval Timelines

Let’s face it—waiting for permits can be frustrating. Depending on your city, the permitting process can take anywhere from one to four months. Delays often arise from incomplete applications, miscommunications with zoning officials, or a backlog of permit requests in high-demand areas.

Solution:
A proactive approach is key. Submitting a complete and detailed application the first time around can significantly speed up the process. Kindred’s team has years of experience working with Colorado municipalities, ensuring your plans are as close to approval-ready as possible. Additionally, using pre-approved ADU designs can shave weeks off your timeline.

3. Permit Costs and Unexpected Fees

Permit fees in Colorado vary widely depending on your city and the type of ADU you’re building. On average, fees range from $1,500 to $10,000, but additional costs can sneak up on you, including:

  • Impact Fees: These fees are charged by some municipalities to offset the strain on local infrastructure caused by new development.

  • Utility Connection Fees: Extending or upgrading water, sewer, and electrical lines can add thousands to your budget.

  • Design Review Fees: Some areas require design approval, especially for granny flats or ADUs in neighborhoods with strict aesthetic guidelines.

Solution:
Budgeting for these expenses upfront is crucial. At Kindred Tiny Homes, we provide transparent pricing that accounts for potential permitting and connection costs, so you’re never caught off guard.

4. Utility Connection Challenges

Connecting your ADU to utilities like water, sewer, and electricity isn’t always as simple as it sounds. Older properties may require significant upgrades to support an additional unit, and properties in more rural areas may need entirely new utility infrastructure.

Solution:
Utility connection challenges are best handled by professionals. Kindred Tiny Homes coordinates with local utility providers to streamline the process and ensure your ADU is fully functional from day one. If upgrades are necessary, we’ll provide a clear cost breakdown so you can plan accordingly.

5. HOA Restrictions

While Colorado’s HB 24-1152 has limited the power of HOAs to outright ban ADUs, they can still enforce reasonable design and aesthetic guidelines. This means your ADU might need to match your primary home in materials, color, and style, which could impact your design options.

Solution:
Before starting your project, review your HOA’s guidelines to avoid surprises later. Kindred’s team is well-versed in working with HOA requirements, ensuring your ADU complies while maintaining the style and functionality you’re envisioning.

6. Meeting Energy Efficiency Standards

Colorado has strict energy efficiency requirements for new constructions, including ADUs. These standards regulate insulation, windows, and HVAC systems to ensure your unit is environmentally friendly and cost-effective to operate.

Solution:
At Kindred Tiny Homes, we specialize in building energy-efficient ADUs that comply with Colorado’s codes. From high-performance insulation to solar-ready roofing options, we help you create a space that’s sustainable and comfortable year-round.


Frequently Asked Questions About ADU Permitting

Let’s face it: building an Accessory Dwelling Unit (ADU) can feel like venturing into uncharted territory. Between zoning laws, permit fees, and endless acronyms, it’s normal to have questions. The good news? You’re not the first to ask, and you definitely won’t be the last. We’ve rounded up the most common questions about ADU permitting in Colorado so you can move forward with clarity—and confidence.

  1. How long does the permitting process take?

The permitting process typically takes 1 to 4 months, depending on the city, the complexity of your project, and the state of your application. In high-demand areas like Denver or Boulder, expect longer review times due to the volume of permit requests. Smaller cities or counties may be quicker but often have unique rules that require extra attention.

Here’s the thing: delays usually happen when plans are incomplete or don’t meet local requirements. That’s why a detailed, error-free application is your best friend. Working with an experienced ADU builder in Colorado, like Kindred Tiny Homes, can save you weeks (or even months) by ensuring your paperwork is spot-on the first time.

If time is of the essence, consider using pre-approved ADU designs offered by some Colorado municipalities. These fast-track the process by meeting most zoning and building code requirements upfront.

  1. Do all properties qualify for an ADU?

Not all properties are eligible for an ADU, but recent changes to Colorado’s laws, like HB 24-1152, have made it easier to qualify. The key factors are zoning, lot size, and setbacks:

  • Zoning: Your property needs to be zoned for an ADU. Most single-family residential zones in Colorado now allow ADUs, but specifics vary by city.
  • Lot Size: Many cities, like Denver, require a minimum lot size of 5,500 square feet for a detached ADU, while smaller lots may qualify for garage conversions or interior units.
  • Setbacks: Setback requirements (distance from property lines) are often stricter for detached units, typically ranging from 5 to 15 feet.

Don’t worry if you’re unsure about eligibility—that’s what we’re here for. Our feasibility assessments take the guesswork out of zoning and help you understand exactly what’s possible on your property.

  1. How much do ADU permits cost?

Permit fees for ADUs in Colorado typically range from $1,500 to $10,000, depending on your city and project scope. That’s just the starting point—additional costs can sneak up, including:

  • Impact Fees: Charged by some municipalities to account for increased use of local infrastructure, like roads or schools.
  • Utility Connection Fees: Extending or upgrading water, sewer, or electrical lines can add thousands to your budget.
  • Design Review Fees: Required in areas with stricter aesthetic or historical guidelines, such as parts of Boulder.

At Kindred Tiny Homes, we believe in transparent pricing. We’ll give you a full breakdown of costs upfront, so there are no surprises along the way.

  1. Can I build an ADU without a permit?

The short answer? No. Building an ADU without a permit isn’t just risky—it’s illegal. Homeowners who skip the permitting process often face hefty fines and could be forced to demolish the structure. Worse, unpermitted ADUs can’t be legally rented out, and they may devalue your property when it’s time to sell.

Getting the proper permits ensures your ADU meets safety standards, zoning laws, and building codes. And while the process may seem daunting, working with an expert ADU builder like Kindred Tiny Homes makes it manageable and stress-free.

  1. Do I need HOA approval to build an ADU?

If you live in a neighborhood with a Homeowners Association (HOA), their rules may apply to your project. Here’s what to know:

  • Thanks to HB 24-1152, HOAs in Colorado can no longer outright ban ADUs. However, they can enforce reasonable design guidelines, such as requiring the ADU to match your primary residence’s style or materials.
  • Some HOAs may also require an additional approval process, which can add time to your project timeline.

At Kindred Tiny Homes, we’re familiar with HOA requirements across Colorado and can help ensure your ADU meets both HOA guidelines and local regulations.

  1. What happens if my permit is denied?

Permit denials are frustrating, but they’re usually not the end of the road. Common reasons for denial include incomplete applications, zoning non-compliance, or technical issues in the design.

What to do next:

  • Address the issue outlined in the denial notice (most cities provide clear explanations).
  • Work with a professional to revise your plans and resubmit.

Kindred Tiny Homes handles these hiccups for you, ensuring your revised application has a higher chance of approval.

How Kindred Tiny Homes Simplifies the ADU Process

Building an Accessory Dwelling Unit (ADU) doesn’t have to feel like a full-time job. While the permitting process, zoning hurdles, and construction details might seem overwhelming, working with a full-service partner like Kindred Tiny Homes can take the weight off your shoulders. From the first consultation to handing over the keys, we simplify the ADU process so you can focus on what really matters: creating a space that works for your family and property.

Here’s how we make building your tiny home or ADU in Colorado seamless and stress-free.

1. Feasibility Made Simple

Before we break ground, we start by ensuring your property is eligible for an ADU. Our team conducts a comprehensive feasibility assessment, analyzing zoning regulations, setbacks, and lot size to determine the best approach for your space.

We also evaluate utilities, access, and potential challenges specific to your location, like slope or drainage issues. Whether you’re planning a detached ADU, a garage conversion, or a modern tiny home, our feasibility assessment ensures your project is set up for success.

2. Design That Fits Your Vision

We know every homeowner’s needs are unique, which is why we offer a personalized approach to design. You can choose from our pre-approved ADU floor plans for faster approvals or work with our design team to create a custom layout that suits your style and functionality.

Our architects and designers focus on blending your ADU seamlessly with your existing home while ensuring it complies with local building codes. From compact tiny home designs to spacious multi-room ADUs, we help you bring your vision to life.

3. Permitting Without the Hassle

Navigating Colorado’s permitting process is one of the trickiest parts of building an ADU. At Kindred Tiny Homes, we take care of the paperwork, submissions, and revisions, so you don’t have to. Here’s how we handle it:

  • Submitting complete, detailed plans that meet your local zoning and building codes.
  • Coordinating with municipal offices to ensure a smooth approval process.
  • Managing revisions quickly to keep your project on track.

By letting us manage the red tape, you can avoid common delays and move forward with confidence.

4. Full-Service Construction

Once your permits are approved, it’s time to bring your ADU to life. We manage every aspect of the build, from site preparation to finishing touches, so you don’t have to juggle multiple contractors or worry about timelines. Here’s what you can expect:

  • Site Preparation: Clearing, grading, and utility hookups are handled by our experienced team.
  • Construction Expertise: Our licensed general contractors and local tradespeople ensure every detail is executed with precision and care.
  • Transparency Throughout: We keep you updated every step of the way with regular progress reports and on-site walkthroughs.

Whether it’s a sleek tiny home for rental income or a cozy granny flat for family, our commitment to quality craftsmanship means your ADU will be built to last.

5. Keys, Warranties, and Peace of Mind

At Kindred Tiny Homes, our work doesn’t stop once construction is complete. We’ll walk you through your finished ADU to ensure everything meets your expectations and provide a comprehensive warranty for added peace of mind:

  • 7-Year Structural Warranty: Protecting your investment for the long haul.
  • 1-Year Workmanship Warranty: Covering the details that matter most.

Your brand-new tiny home or ADU will be ready for whatever you’ve planned—be it housing family, generating rental income, or simply creating the extra space you’ve always wanted.

Why Kindred Tiny Homes?

Building an ADU is a significant investment, and who you partner with matters. At Kindred Tiny Homes, we don’t just build spaces—we create experiences. Here’s why homeowners across Colorado choose us:

  • Expertise in Colorado Regulations: We know the ins and outs of local zoning and permitting, so your project is always compliant.

  • Transparent Pricing: No hidden fees, no surprises—just clear, upfront estimates for your tiny home construction.

  • Stress-Free Process: With everything under one roof, we simplify the ADU process from start to finish.

Conclusion

From the moment you decide to build an ADU, our team at Kindred Tiny Homes is here to make the process as seamless as possible. Whether you’re dreaming of a rental-ready tiny home, a granny flat for family, or a custom addition to your property, we’ve got the expertise to bring your vision to life.

➡️ Ready to take the next step?
Schedule your free consultation today and let’s get started on your ADU journey.

Need Expert Advice?

Have questions about ADUs? Contact our team for expert guidance.

Free Consultation

Let's build
something
great together

Ready to build your dream tiny home?

March 31, 2025

THE COMPLETE GUIDE TO ADU PERMITTING IN COLORADO

What is an ADU?

Think of an Accessory Dwelling Unit (ADU) as a mini home that shares your property with your main house. These compact, fully livable spaces have their own kitchen, bathroom, and sleeping area—perfect for housing family members, generating rental income, or creating a flexible guest retreat.

Types of ADUs

  1. Detached ADUs: These are standalone units, like a tiny home in your backyard. They offer the most privacy and work well as rentals or for hosting long-term guests.

  2. Attached ADUs: These share at least one wall with your home—think of it as an add-on unit that blends seamlessly with your main house.
  3. Garage Conversions: If you have an unused garage, converting it into an ADU is a cost-effective way to create extra space.

No matter the type, ADUs are all about making the most of your property in a way that fits your lifestyle.

Why Build an ADU in Colorado?

Let’s talk about why ADUs are a game-changer, especially here in Colorado. Whether you’re looking to make extra money or bring family closer, the benefits of an ADU are hard to beat.

Generate Rental Income

  • Renting out your ADU is one of the easiest ways to create passive income. In Colorado, you can expect to earn between $1,500 and $2,500 a month, depending on location and size.

  • ADUs are also perfect for short-term rentals, catering to Colorado’s thriving tourism market.

Create Multi-Generational Living Spaces

  • Whether you’re looking for a solution for aging parents or adult kids who need a little help starting out, ADUs offer the perfect blend of independence and togetherness.

Boost Property Value

  • Adding an ADU can increase your home’s resale value by 20–35%, making it an investment that pays off in more ways than one.

Support Sustainability

  • ADUs use your existing property efficiently, making them an eco-friendly option compared to building a separate home.

Enjoy Favorable Legislation

  • Thanks to recent laws like HB 24-1152, Colorado has made it easier than ever to build an ADU. The law removes barriers like restrictive zoning, so more homeowners can build without the headache.

Understanding ADU Permitting in Colorado

Building an Accessory Dwelling Unit (ADU) in Colorado requires more than just a great design and a solid plan—it also means navigating the permitting process. Permits ensure your ADU meets local building codes, zoning laws, and safety standards. These regulations are in place to keep both the homeowner and the community safe while ensuring that the tiny home or granny flat you build fits within the neighborhood.

In Colorado, the permitting process can vary by city or county, but it typically follows a similar path. Here’s a closer look at what the ADU permitting process involves, and how to ensure your project is compliant.

What Does the ADU Permitting Process Involve?

At its core, the ADU permitting process ensures that your new unit is safe, legal, and functional. The primary goal is to make sure your ADU:

  • Meets local building codes: Ensures structural integrity, safe electrical and plumbing systems, and proper energy efficiency.

  • Complies with zoning regulations: Ensures that your ADU fits within the allowed use for your property and adheres to local zoning laws.

  • Protects the environment and neighborhood: Confirms your ADU complies with local restrictions on things like water usage, waste management, and parking.

Permitting is a non-negotiable part of the construction process and must be done before any work begins. When it comes to tiny homes or granny flats, getting the proper permits ensures that your project is not only compliant with state and local laws but also built to last.

What Permits Do You Need?

You’ll need several key permits to move forward with your ADU in Colorado. The permitting process generally involves the following:

  1. Zoning Permits
    Zoning regulations are critical to the success of your ADU project. They determine where and how you can build on your property. In Colorado, zoning regulations vary significantly by city and county. Common zoning requirements for ADUs include:


    • Minimum lot size and setback requirements (distance from property lines).
    • Height limitations for your detached ADU or other structures.
    • Requirements for parking spaces (though some areas, like Denver, have waived this in transit-oriented zones).
    • Design review processes in certain neighborhoods (especially in historical or highly regulated areas).

These regulations ensure that your ADU won’t negatively affect your property’s aesthetic or impact neighboring homes. For example, in Denver, you need to verify that the ADU zoning allows for a structure like a tiny home for sale or a granny flat to be built on your property.


  1. Building Permits

    Once your ADU passes the zoning review, you’ll need a building permit. This permit ensures that the construction of your tiny home or granny flat meets all safety and structural standards. Building permits cover:


    • The structural design of the ADU, including its foundation, framing, and roofing.

    • Safety requirements, including electrical, plumbing, and mechanical systems.

    • The overall energy efficiency of the structure, including insulation, windows, and HVAC systems, which are essential in Colorado’s climate.

A qualified ADU builder in Colorado, like Kindred Tiny Homes, can help ensure that all these components are up to code and make the permitting process smoother. With our expertise in tiny home construction and local ADU regulations, we’ll make sure everything is done right from the start.


  1. Utility Permits

    Connecting your ADU to utilities (water, sewer, electrical, and sometimes gas) is another essential step in the permitting process. Utility permits ensure that the connections are safe and meet local codes. Depending on your property, these connections may need to be upgraded or extended.


    • Water and sewer connections can be costly and time-consuming if your property isn’t already connected to the mainline. You may need to upgrade your system to accommodate your new ADU.

    • Electrical upgrades: If your existing system isn’t sufficient to support the additional load, you may need to upgrade your electrical panel or wiring.

    • Gas lines may also require adjustments depending on whether your ADU will have a gas stove, water heater, or other appliances.

At Kindred Tiny Homes, we help navigate these complexities by managing all utility permits and working with trusted local contractors to ensure smooth connections

  1. Energy Compliance

One of the most important aspects of the permitting process is ensuring that your ADU meets Colorado’s energy efficiency standards. These standards help reduce the energy footprint of new buildings and are designed to lower operating costs in the long term.

  • The Colorado Energy Code sets requirements for insulation, windows, and HVAC systems to ensure your ADU remains energy efficient year-round.

  • Many tiny homes for sale in Colorado are designed with sustainability in mind, and adherence to these energy codes not only helps the environment but can also result in lower energy bills for homeowners and tenants.

At Kindred Tiny Homes, we’re experts at navigating the ADU construction process in Colorado, so you don’t have to worry about the paperwork. From zoning permits to energy compliance, we handle the details so you can focus on building your dream space.

Zoning and Eligibility Requirements

Building an Accessory Dwelling Unit (ADU) in Colorado starts with understanding the zoning and eligibility requirements for your property. Each city and county in Colorado has unique rules and regulations governing where and how ADUs can be built. Navigating these zoning laws can feel complex, but understanding them is essential for a smooth project.

Here’s a deeper dive into what you need to know to determine if your property is eligible for an ADU, along with tips for overcoming common hurdles.

Key Zoning Factors for ADUs in Colorado

  1. Lot Size
    • Many cities, including Denver and Boulder, require a minimum lot size to build an ADU. For example, Denver typically mandates a lot size of 5,500 square feet for a detached ADU.

    • Smaller lots may still qualify for interior ADUs or garage conversions, making them an excellent option for homeowners with limited space.

Always check with your local zoning office or consult an experienced ADU builder in Colorado to confirm your lot’s eligibility.

  1. Setback Requirements:


    • Setbacks refer to the required distance between your ADU and the property line. In most areas, setbacks range from 5 to 15 feet, depending on local regulations.

    • Rear and side setbacks are typically stricter for detached ADUs, while attached ADUs or garage conversions often have more lenient rules.

  2. Height Restrictions


    • Height limits are usually in place to ensure ADUs remain proportional to the main residence and do not overshadow neighboring homes.

    • Most municipalities cap ADU height at 16 to 25 feet, depending on the type of unit and the zoning district. Detached ADUs may have stricter limits compared to attached ADUs or garage conversions.

    • For homeowners planning a two-story ADU, it’s critical to verify these limits early in the design process to avoid costly revisions.

  3. Parking Requirements


    • Some cities require that properties with ADUs provide at least one additional parking space for the unit.

    • However, progressive cities like Denver have waived parking requirements in certain transit-oriented areas, making ADU development more accessible.

    • If parking is required, think creatively—such as utilizing a driveway extension or shared parking space—to meet local rules without compromising your property layout.


  4. Design and Aesthetic Guidelines


    • In neighborhoods with historical significance or strict HOAs, there may be additional design requirements for ADUs. These might include materials, rooflines, and architectural features that match the primary residence or neighborhood.

    • While Colorado’s HB 24-1152 limits HOA restrictions, they can still enforce reasonable guidelines to maintain the character of the area.

Permitting Steps: From Start to Approval

The permitting process is one of the most critical steps in building an Accessory Dwelling Unit (ADU) in Colorado. It ensures your unit is legal, safe, and ready for construction. Each stage of the process plays a role in turning your vision into reality. Let’s walk through the steps, adding depth to help you better understand what to expect and how to prepare.

Step 1. Feasibility Assessment

Before diving into the design and construction of your ADU, the first step is conducting a feasibility assessment. This initial stage determines whether your property is eligible for an ADU based on local zoning regulations and physical constraints.

  • Site Evaluation: A professional will review your lot size, setbacks, and access to utilities, ensuring it meets Colorado’s zoning requirements. For example, in cities like Denver, lot size and rear setbacks are key factors that influence feasibility.

  • Zoning Research: Understanding local rules is crucial. Some municipalities, like Boulder, have stricter rules for setbacks and parking, while others, like Colorado Springs, are more flexible.

This step saves you time and money by identifying potential roadblocks before you invest in design or permitting.

Step 2. Design and Planning

With feasibility confirmed, the next step is to design your ADU. This is where your vision starts to take shape.

  • Architectural Design: You’ll work with an architect or design team to create a plan that fits your needs while adhering to local regulations. This includes decisions about unit size, layout, and features like energy-efficient windows or solar-ready roofing.

  • Pre-Approved Plans: Some cities offer pre-approved ADU designs, which can simplify the permitting process and reduce review time. These plans are particularly popular in tiny home construction, as they streamline compliance with building codes.

  • Customization: Whether you’re planning a detached ADU, a garage conversion, or an attached unit, this stage allows for personal touches that make the space uniquely yours.

The design process typically takes 1–3 months, depending on the complexity of the project and local permitting requirements.

Step 3. Permit Submission

Once your design is finalized, it’s time to submit the plans for permits. This is often the most time-consuming part of the process, as it involves multiple layers of review.

  • Zoning Review: Local zoning officials will evaluate your plans to ensure they comply with setbacks, height restrictions, and other requirements. In areas like Denver, Boulder and Fort Collins, the review may include neighborhood-specific design guidelines.

  • Building Permit Application: This step involves submitting detailed architectural and engineering plans. These documents must cover everything from the structural integrity of the unit to electrical and plumbing systems.

  • Utility Permits: You’ll also need permits to connect your ADU to water, sewer, and electrical systems. If your property requires utility upgrades, these will need to be approved as well.

The timeline for this stage varies, typically taking 1–4 months. Delays can occur if plans need revisions or if local offices are backlogged, but an experienced ADU builder can help navigate these challenges.

Step 4. Permit Approval

Receiving your permits is a major milestone—it means your plans are fully approved, and construction can officially begin.

  • Pre-Construction Checklist: Before breaking ground, confirm all permits are valid and accessible on-site. Some cities require that permits be displayed during construction.
  • Utility Preparations: If your project includes utility upgrades, ensure your contractors are ready to coordinate with local utility providers.

This stage also marks the transition from planning to action. At Kindred Tiny Homes, we make sure every detail is squared away before moving forward, so you can start your build with confidence.

Challenges of ADU Permitting and How to Overcome Them

Building an Accessory Dwelling Unit (ADU) in Colorado is an exciting venture, but the permitting process can come with its share of challenges. These obstacles are often the reason many homeowners feel overwhelmed before they even begin. The good news? Understanding these potential roadblocks ahead of time—and knowing how to navigate them—can make all the difference.

Here’s a deeper look at the most common permitting challenges and how to overcome them, with a few tips to keep your project on track.

1. Navigating Complex Regulations

Every city and county in Colorado has its own set of zoning laws, building codes, and energy standards for ADUs. These regulations vary widely, which means what works in Denver might not apply in Boulder, and what’s permissible in Colorado Springs may not fly in Fort Collins.

For example:

  • Lot size and setbacks often limit where you can place a detached ADU on your property.
  • Historical neighborhoods may have stricter design guidelines to preserve the area’s character.
  • Cities like Boulder may enforce tighter height restrictions, while Denver’s transit-oriented zones waive parking requirements for ADUs.

Solution:
Partnering with an experienced ADU builder in Colorado is the easiest way to navigate these complexities. At Kindred Tiny Homes, we know the ins and outs of Colorado’s ADU regulations, saving you hours of research and ensuring your project complies with local laws.

2. Lengthy Approval Timelines

Let’s face it—waiting for permits can be frustrating. Depending on your city, the permitting process can take anywhere from one to four months. Delays often arise from incomplete applications, miscommunications with zoning officials, or a backlog of permit requests in high-demand areas.

Solution:
A proactive approach is key. Submitting a complete and detailed application the first time around can significantly speed up the process. Kindred’s team has years of experience working with Colorado municipalities, ensuring your plans are as close to approval-ready as possible. Additionally, using pre-approved ADU designs can shave weeks off your timeline.

3. Permit Costs and Unexpected Fees

Permit fees in Colorado vary widely depending on your city and the type of ADU you’re building. On average, fees range from $1,500 to $10,000, but additional costs can sneak up on you, including:

  • Impact Fees: These fees are charged by some municipalities to offset the strain on local infrastructure caused by new development.

  • Utility Connection Fees: Extending or upgrading water, sewer, and electrical lines can add thousands to your budget.

  • Design Review Fees: Some areas require design approval, especially for granny flats or ADUs in neighborhoods with strict aesthetic guidelines.

Solution:
Budgeting for these expenses upfront is crucial. At Kindred Tiny Homes, we provide transparent pricing that accounts for potential permitting and connection costs, so you’re never caught off guard.

4. Utility Connection Challenges

Connecting your ADU to utilities like water, sewer, and electricity isn’t always as simple as it sounds. Older properties may require significant upgrades to support an additional unit, and properties in more rural areas may need entirely new utility infrastructure.

Solution:
Utility connection challenges are best handled by professionals. Kindred Tiny Homes coordinates with local utility providers to streamline the process and ensure your ADU is fully functional from day one. If upgrades are necessary, we’ll provide a clear cost breakdown so you can plan accordingly.

5. HOA Restrictions

While Colorado’s HB 24-1152 has limited the power of HOAs to outright ban ADUs, they can still enforce reasonable design and aesthetic guidelines. This means your ADU might need to match your primary home in materials, color, and style, which could impact your design options.

Solution:
Before starting your project, review your HOA’s guidelines to avoid surprises later. Kindred’s team is well-versed in working with HOA requirements, ensuring your ADU complies while maintaining the style and functionality you’re envisioning.

6. Meeting Energy Efficiency Standards

Colorado has strict energy efficiency requirements for new constructions, including ADUs. These standards regulate insulation, windows, and HVAC systems to ensure your unit is environmentally friendly and cost-effective to operate.

Solution:
At Kindred Tiny Homes, we specialize in building energy-efficient ADUs that comply with Colorado’s codes. From high-performance insulation to solar-ready roofing options, we help you create a space that’s sustainable and comfortable year-round.


Frequently Asked Questions About ADU Permitting

Let’s face it: building an Accessory Dwelling Unit (ADU) can feel like venturing into uncharted territory. Between zoning laws, permit fees, and endless acronyms, it’s normal to have questions. The good news? You’re not the first to ask, and you definitely won’t be the last. We’ve rounded up the most common questions about ADU permitting in Colorado so you can move forward with clarity—and confidence.

  1. How long does the permitting process take?

The permitting process typically takes 1 to 4 months, depending on the city, the complexity of your project, and the state of your application. In high-demand areas like Denver or Boulder, expect longer review times due to the volume of permit requests. Smaller cities or counties may be quicker but often have unique rules that require extra attention.

Here’s the thing: delays usually happen when plans are incomplete or don’t meet local requirements. That’s why a detailed, error-free application is your best friend. Working with an experienced ADU builder in Colorado, like Kindred Tiny Homes, can save you weeks (or even months) by ensuring your paperwork is spot-on the first time.

If time is of the essence, consider using pre-approved ADU designs offered by some Colorado municipalities. These fast-track the process by meeting most zoning and building code requirements upfront.

  1. Do all properties qualify for an ADU?

Not all properties are eligible for an ADU, but recent changes to Colorado’s laws, like HB 24-1152, have made it easier to qualify. The key factors are zoning, lot size, and setbacks:

  • Zoning: Your property needs to be zoned for an ADU. Most single-family residential zones in Colorado now allow ADUs, but specifics vary by city.
  • Lot Size: Many cities, like Denver, require a minimum lot size of 5,500 square feet for a detached ADU, while smaller lots may qualify for garage conversions or interior units.
  • Setbacks: Setback requirements (distance from property lines) are often stricter for detached units, typically ranging from 5 to 15 feet.

Don’t worry if you’re unsure about eligibility—that’s what we’re here for. Our feasibility assessments take the guesswork out of zoning and help you understand exactly what’s possible on your property.

  1. How much do ADU permits cost?

Permit fees for ADUs in Colorado typically range from $1,500 to $10,000, depending on your city and project scope. That’s just the starting point—additional costs can sneak up, including:

  • Impact Fees: Charged by some municipalities to account for increased use of local infrastructure, like roads or schools.
  • Utility Connection Fees: Extending or upgrading water, sewer, or electrical lines can add thousands to your budget.
  • Design Review Fees: Required in areas with stricter aesthetic or historical guidelines, such as parts of Boulder.

At Kindred Tiny Homes, we believe in transparent pricing. We’ll give you a full breakdown of costs upfront, so there are no surprises along the way.

  1. Can I build an ADU without a permit?

The short answer? No. Building an ADU without a permit isn’t just risky—it’s illegal. Homeowners who skip the permitting process often face hefty fines and could be forced to demolish the structure. Worse, unpermitted ADUs can’t be legally rented out, and they may devalue your property when it’s time to sell.

Getting the proper permits ensures your ADU meets safety standards, zoning laws, and building codes. And while the process may seem daunting, working with an expert ADU builder like Kindred Tiny Homes makes it manageable and stress-free.

  1. Do I need HOA approval to build an ADU?

If you live in a neighborhood with a Homeowners Association (HOA), their rules may apply to your project. Here’s what to know:

  • Thanks to HB 24-1152, HOAs in Colorado can no longer outright ban ADUs. However, they can enforce reasonable design guidelines, such as requiring the ADU to match your primary residence’s style or materials.
  • Some HOAs may also require an additional approval process, which can add time to your project timeline.

At Kindred Tiny Homes, we’re familiar with HOA requirements across Colorado and can help ensure your ADU meets both HOA guidelines and local regulations.

  1. What happens if my permit is denied?

Permit denials are frustrating, but they’re usually not the end of the road. Common reasons for denial include incomplete applications, zoning non-compliance, or technical issues in the design.

What to do next:

  • Address the issue outlined in the denial notice (most cities provide clear explanations).
  • Work with a professional to revise your plans and resubmit.

Kindred Tiny Homes handles these hiccups for you, ensuring your revised application has a higher chance of approval.

How Kindred Tiny Homes Simplifies the ADU Process

Building an Accessory Dwelling Unit (ADU) doesn’t have to feel like a full-time job. While the permitting process, zoning hurdles, and construction details might seem overwhelming, working with a full-service partner like Kindred Tiny Homes can take the weight off your shoulders. From the first consultation to handing over the keys, we simplify the ADU process so you can focus on what really matters: creating a space that works for your family and property.

Here’s how we make building your tiny home or ADU in Colorado seamless and stress-free.

1. Feasibility Made Simple

Before we break ground, we start by ensuring your property is eligible for an ADU. Our team conducts a comprehensive feasibility assessment, analyzing zoning regulations, setbacks, and lot size to determine the best approach for your space.

We also evaluate utilities, access, and potential challenges specific to your location, like slope or drainage issues. Whether you’re planning a detached ADU, a garage conversion, or a modern tiny home, our feasibility assessment ensures your project is set up for success.

2. Design That Fits Your Vision

We know every homeowner’s needs are unique, which is why we offer a personalized approach to design. You can choose from our pre-approved ADU floor plans for faster approvals or work with our design team to create a custom layout that suits your style and functionality.

Our architects and designers focus on blending your ADU seamlessly with your existing home while ensuring it complies with local building codes. From compact tiny home designs to spacious multi-room ADUs, we help you bring your vision to life.

3. Permitting Without the Hassle

Navigating Colorado’s permitting process is one of the trickiest parts of building an ADU. At Kindred Tiny Homes, we take care of the paperwork, submissions, and revisions, so you don’t have to. Here’s how we handle it:

  • Submitting complete, detailed plans that meet your local zoning and building codes.
  • Coordinating with municipal offices to ensure a smooth approval process.
  • Managing revisions quickly to keep your project on track.

By letting us manage the red tape, you can avoid common delays and move forward with confidence.

4. Full-Service Construction

Once your permits are approved, it’s time to bring your ADU to life. We manage every aspect of the build, from site preparation to finishing touches, so you don’t have to juggle multiple contractors or worry about timelines. Here’s what you can expect:

  • Site Preparation: Clearing, grading, and utility hookups are handled by our experienced team.
  • Construction Expertise: Our licensed general contractors and local tradespeople ensure every detail is executed with precision and care.
  • Transparency Throughout: We keep you updated every step of the way with regular progress reports and on-site walkthroughs.

Whether it’s a sleek tiny home for rental income or a cozy granny flat for family, our commitment to quality craftsmanship means your ADU will be built to last.

5. Keys, Warranties, and Peace of Mind

At Kindred Tiny Homes, our work doesn’t stop once construction is complete. We’ll walk you through your finished ADU to ensure everything meets your expectations and provide a comprehensive warranty for added peace of mind:

  • 7-Year Structural Warranty: Protecting your investment for the long haul.
  • 1-Year Workmanship Warranty: Covering the details that matter most.

Your brand-new tiny home or ADU will be ready for whatever you’ve planned—be it housing family, generating rental income, or simply creating the extra space you’ve always wanted.

Why Kindred Tiny Homes?

Building an ADU is a significant investment, and who you partner with matters. At Kindred Tiny Homes, we don’t just build spaces—we create experiences. Here’s why homeowners across Colorado choose us:

  • Expertise in Colorado Regulations: We know the ins and outs of local zoning and permitting, so your project is always compliant.

  • Transparent Pricing: No hidden fees, no surprises—just clear, upfront estimates for your tiny home construction.

  • Stress-Free Process: With everything under one roof, we simplify the ADU process from start to finish.

Conclusion

From the moment you decide to build an ADU, our team at Kindred Tiny Homes is here to make the process as seamless as possible. Whether you’re dreaming of a rental-ready tiny home, a granny flat for family, or a custom addition to your property, we’ve got the expertise to bring your vision to life.

➡️ Ready to take the next step?
Schedule your free consultation today and let’s get started on your ADU journey.